Skip to content
Saad JamalContracting

General & Specialized Manpower in Saudi Arabia

Saad Jamal Contracting supplies skilled, semi-skilled and general workers to construction, maintenance and industrial projects in Saudi Arabia, temporarily or for the length of the project. Send the trades, numbers, site and duration, and we reply with a written quotation.

Updated:

General & Specialized Manpower

We supply skilled, semi-skilled and general workers with flexible supply, temporary or for the length of the project, under a written scope that fixes trades and numbers.

Facts at a glance

Service
Skilled, semi-skilled and general manpower supply
Supply period
Temporary or for the length of the project
Coverage
Saudi Arabia, from our office in Dammam
Pricing
Written quotation
What we need from you
Trades, numbers, site, duration, working hours

What the service covers

  • Skilled workers for construction and finishing
  • Semi-skilled workers and helpers
  • General labour for sites and projects
  • Specialist technicians on request
  • Temporary or project-length supply
  • Transparent cost tracking and timely payments

Worker categories

Skilled workers carry out a trade on their own, such as carpenters, steel fixers, electricians, plumbers and plasterers. Semi-skilled workers assist a trade under supervision, and general workers handle moving, cleaning and site preparation.

Defining the category precisely avoids disputes about rate and output, so describe the actual tasks, not only the job title.

What to agree in the contract

Working hours, overtime and rest days; who provides accommodation, transport, meals and protective equipment; how a worker is replaced; how timesheets are approved; and when invoices are issued and paid.

Manpower supply in the Kingdom is governed by labour regulations and the competent authorities. Ask for the regulatory documents you need before contracting.

Planning the numbers

Spread headcount across project phases instead of ordering the peak on day one: site works, then structure, then finishing. It reduces idle time and makes supervision easier.

Name a supervisor on your side to allocate tasks daily and sign the timesheet.

Manpower supply for companies and factories: what affects cost

Cost depends on the trades and skill level, numbers, duration, working hours and overtime, site location, entry requirements, and who provides accommodation, transport, meals and protective equipment.

If you are looking for a manpower supplier in Dammam or the Eastern Province, send the trades, numbers and site, and the written quotation states what can be supplied and on what terms.

Example trades by project phase

PhaseExample trades
Site preparationGeneral workers, plant operators
StructureShuttering carpenter, steel fixer, concrete crew, scaffolders
FinishingPlasterer, painter, tiler, joiner
Electrical and mechanicalElectrician, plumber, AC technician
Industrial maintenanceWelder, fitter, scaffolders, helpers

Trades you can ask for

State the trade and number in your request; availability is confirmed in the quotation.

Civil

  • Shuttering carpenter
  • Steel fixer
  • Block mason
  • Plaster mason
  • Tile fitter
  • Gypsum worker
  • Civil helper

Scaffolding and welding

  • Scaffolder
  • Scaffolding foreman
  • 3G welder
  • 6G welder
  • TIG welder

Mechanical and piping

  • Pipe fitter
  • Pipe fabricator
  • Iron worker
  • Duct fitter
  • Millwright fitter

Electrical and instrumentation

  • Electrician
  • Cable termination technician
  • Cable puller
  • Instrument technician

Painting

  • Roller painter
  • Spray painter
  • Sand blaster

Operators and drivers

  • Crane operator
  • Forklift operator
  • Man lift operator
  • Driver

What to put in your request

  • Trades needed and the number of each
  • Task description and experience level
  • Site, start date and duration
  • Working hours and days per week
  • Accommodation, transport, meals and protective equipment
  • Documents or permits your site requires

What to check on arrival

  • Iqama or ID matches and is valid
  • Trade matches what was requested
  • A short practical test for skilled trades
  • Protective equipment complete and safety briefing done
  • Attendance recorded from day one
FAQ

Frequently asked questions

How do I request workers for my project?

Send us the trades, numbers, project location and expected duration, and we will reply with a written quotation.

How long can the manpower be supplied for?

Temporarily or for the length of your project.

Is there a minimum number of workers?

Send your requirement as it is and our reply will say what can be supplied and on what terms.

Can we change the numbers during the project?

Yes, you can ask for more or fewer; the method and notice period are set in the contract.

What if a worker is not suitable?

Agree replacement terms and timing in the contract in advance so work does not stop.

Does the price include accommodation and transport?

Do not assume so unless it is written. The quotation states what is included and what is on the client.

Request a Quote

Have a project? Let's start with a conversation

Fill in the form and your request reaches us by email.

  • info@saadjamal.sa
  • Sunday – Thursday, 8:00 AM – 5:00 PM
  • Zuhair Bin Qais Street, Taybah, Dammam 34271, Saudi Arabia

We use your details only to answer your request; they reach us by email through the Resend service.