Welder Supply in Saudi Arabia

Saad Jamal Contracting supplies welders for structural, pipe, maintenance and fabrication work in Saudi Arabia. Tell us the welding process, material, positions, number of welders and duration, and we send you a written quotation.

Updated:

Welder Supply

We supply skilled welders for structural, mechanical and industrial welding, in the numbers and specialities your project needs, in line with site quality and safety requirements.

Facts at a glance

Service
Welder supply: structural, pipe, maintenance, workshop
Supply period
Temporary or for the length of the project
Coverage
Saudi Arabia, from our office in Dammam
Pricing
Written quotation
What we need from you
Process, material, thickness, positions, code

What the service covers

  • Structural and steel-frame welding
  • Pipe and pipeline welding
  • Maintenance and repair welding
  • Workshop fabrication and assembly
  • Site quality and inspection requirements
  • Safety and hot-work procedures

Common welding processes

SMAW (stick) is common on open sites and construction. GTAW (TIG) is used for precision and for root passes on pipe. GMAW (MIG) is faster in workshops, and FCAW suits thicker sections and structural work.

Much pipe work combines two processes, for example a TIG root with stick fill, so state exactly what you need.

Qualification and weld tests

Code work calls for a welding procedure specification (WPS) and a welder qualified to it. Common codes are ASME Section IX for vessels and piping, and AWS D1.1 for structural steel.

A qualification is tied to process, material range, thickness and position, so a test weld at the client's site is normal before work starts. Decide who witnesses the test and who pays for it.

Hot work safety

Site welding needs a hot work permit, combustibles removed or covered, a fire watch with an extinguisher and enough ventilation, especially in confined spaces, which need their own entry permit.

Protective equipment includes a welding helmet with a suitable lens, heat-resistant gloves and clothing, and respiratory protection where required.

What affects the cost of welder supply

Cost depends on the welding process and material, the positions required (1G to 6G), the code and acceptance test, the number of welders and duration, who provides machines and consumables, and the site location.

6G pipe welding is a different request from structural welding in a workshop, so a precise description saves review time and avoids a welder failing the test on arrival.

Welding positions to specify

PositionMeaning
1G / 1FFlat
2G / 2FHorizontal
3G / 3FVertical
4G / 4FOverhead
6GFixed pipe inclined at 45 degrees

What to put in your request

  • The welding process required
  • Material, thickness range or pipe diameter
  • Positions and the code or client specification
  • Number of welders, and whether you need helpers or fitters
  • Who provides welding machines and consumables
  • Site, start date and duration

What to check on arrival

  • ID or iqama matches
  • Qualification certificates and their range reviewed
  • Test weld completed before work where required
  • Protective equipment complete
  • Briefed on the site's hot work permit system
FAQ

Frequently asked questions

Can you supply welders for a short period?

Yes. We supply welders temporarily or for the length of the project.

How can I verify the welders' skills?

Qualifications can be reviewed or a skills test arranged before mobilisation, according to your project and site requirements.

Can we test welders before accepting them?

Yes, make a weld test a condition of your request. Agree the test location and acceptance criteria in advance.

Do you provide welding machines and consumables?

That is set in the quotation. Say in your request whether you need equipment or will provide it on site.

Can you supply welders for a shutdown?

Send us the shutdown window, numbers and skills as early as possible and we reply with what can be supplied and when.

What is the difference between 3G and 6G?

3G is vertical plate welding. 6G is a fixed pipe inclined at 45 degrees and usually qualifies a wider range of positions.

Request a Quote

Have a project? Let's start with a conversation

Fill in the form and your request reaches us by email.

  • info@saadjamal.sa
  • Sunday – Thursday, 8:00 AM – 5:00 PM
  • Zuhair Bin Qais Street, Taybah, Dammam 34271, Saudi Arabia

We use your details only to answer your request; they reach us by email through the Resend service.